CORSIA First Phase at a glance
The rules below come from ICAO, the UN agency that runs CORSIA. Each fact links to the official source.
- 2024–2026First Phase compliance period, followed by the Second Phase (2027–2035)ICAO Resolution A42-22
- 31 Jan 2028Deadline for aeroplane operators to cancel First Phase eligible unitsICAO CORSIA Newsletter, Oct 2025
- 2021–2026Years of emission reductions that First Phase eligible units can come fromICAO, CORSIA Eligible Emissions Units
- 130States take part in CORSIA in 2026ICAO Resolution A42-22
Who must comply
- Aeroplane operators emitting more than 10,000 tonnes of CO2 a year from international flights.
- Flights with aeroplanes above 5,700 kg maximum take-off mass. Humanitarian, medical and firefighting flights are exempt.
- Offsetting requirements apply to flights on routes between participating States.
How much to offset
- From 2024 the CORSIA baseline is 85% of the sector’s 2019 emissions.
- Each State multiplies an operator’s covered emissions by ICAO’s annual sector’s growth factor.
- The sector’s growth factor is 0.15405257 for 2024 (revised December 2025) and 0.18157674 for 2025 (ICAO CCR, current edition, October 2026), before claims for CORSIA eligible fuels.
- States notify each operator of its total final First Phase requirement by 30 November 2027.
ICAO CCR: Annual Sector’s Growth Factor, current edition (Oct 2026) · ICAO Newsletter, Oct 2025
Eligible units
Units must come from a programme approved by ICAO for the First Phase. The approved programmes are listed in the current edition of the ICAO document CORSIA Eligible Emissions Units.
- From activities whose first crediting period started on or after 1 January 2016.
- For emission reductions that occurred from 1 January 2021 to 31 December 2026.
- Authorised by the host country with an attestation that the reductions will not be double-claimed (a Letter of Authorization). Depending on the programme, the corresponding adjustment must be verified or covered by a programme-approved guarantee.
- Issued, labelled and cancelled in the programme-designated registry.
How to buy CORSIA eligible units with ClimateTrade
One team handles your request from the first estimate to the cancellation evidence your State needs.
- 01
Share your requirement
Tell us your estimated First Phase offsetting requirement, your State of attribution, your timing and any preferences on programme, project type, host country or vintage.
- 02
Receive matched options
We send you First Phase eligible options with, for each one, the programme, methodology, vintage, registry label, Letter of Authorization status and corresponding adjustment status.
- 03
Run your due diligence
Your compliance team checks every unit against the ICAO document CORSIA Eligible Emissions Units. We share full project documentation and answer every question.
- 04
Agree your quote
We confirm volume, price and delivery dates in a written quote, so you can secure units well before the 31 January 2028 deadline.
- 05
Cancel and report
Units are cancelled in the programme-designated registry, as CORSIA requires, and you receive the cancellation evidence for your Emissions Unit Cancellation Report.
Our team works in English and Spanish from Miami (headquarters) and Valencia (European office).
First Phase eligible units, on request
We have projects with a Letter of Authorization (LoA) and a corresponding adjustment (CA), among others. Ask us for what you need and we will reply with the options that fit your requirement, documented one by one.
By programme and project type
Units from ICAO-approved programmes, including the methodology, project type, host country or carbon removal type you prefer.
By authorisation
Each option comes with its host-country Letter of Authorization status, its corresponding adjustment status and its registry label.
By vintage and timing
Emission reductions from 2021 to 2026, with delivery dates agreed in your quote ahead of 31 January 2028.
Tell us your requirement and we will send you the options and the documentation for each one.
Request a quoteCORSIA First Phase: frequently asked questions
Short answers to the questions airlines, aircraft operators and compliance teams ask us most often. Sources are listed at the end of the page.
What is CORSIA?
CORSIA, the Carbon Offsetting and Reduction Scheme for International Aviation, is the market-based measure adopted by ICAO to address CO2 emissions from international flights. Aeroplane operators monitor, report and verify their emissions, and offset growth above the CORSIA baseline by cancelling CORSIA eligible emissions units. ICAO Assembly Resolution A42-22 calls it the only global market-based measure applying to CO2 emissions from international aviation.
What is the CORSIA First Phase?
The First Phase is the 2024–2026 compliance period. It follows the pilot phase (2021–2023) and comes before the Second Phase (2027–2035), when participation becomes based on each State’s share of international aviation activity. Participation in the First Phase is voluntary for States, and 130 States take part in 2026.
Which airlines must comply with CORSIA?
Aeroplane operators that emit more than 10,000 tonnes of CO2 a year from international flights with aeroplanes above 5,700 kg maximum take-off mass. Humanitarian, medical and firefighting flights are exempt. Offsetting requirements apply to flights on routes between participating States.
How much does an aeroplane operator have to offset in the First Phase?
From 2024 the baseline is 85% of the sector’s 2019 emissions. Each year ICAO publishes a sector’s growth factor, and each State applies it to the covered emissions of the operators attributed to it. The factor is 0.15405257 for 2024 (revised in December 2025) and 0.18157674 for 2025 (published in October 2026; current edition on the ICAO CCR page), before claims for CORSIA eligible fuels.
What is the deadline to cancel CORSIA First Phase units?
31 January 2028. States notify each operator of its total final First Phase offsetting requirement by 30 November 2027. The operator then meets it by purchasing and cancelling the same number of CORSIA eligible emissions units, where each unit represents one tonne of CO2, and reports the cancellations to its State.
Which programmes can supply CORSIA First Phase eligible units?
The programmes approved by the ICAO Council, on the advice of its Technical Advisory Body (TAB), and listed in the current edition of the ICAO document CORSIA Eligible Emissions Units. Units must come from activities whose first crediting period started on or after 1 January 2016 and cover reductions from 2021 to 2026. Check the current edition before cancelling units, because ICAO updates the list.
What is a Letter of Authorization in CORSIA?
It is the host country’s authorisation of emissions units for use in CORSIA. With it, the country attests that the underlying emission reductions will not be double-claimed, for example also counted towards its own climate target. ICAO requires this host-country attestation for First Phase units from 2021 onward.
What is a corresponding adjustment?
An accounting step under Article 6 of the Paris Agreement. When a host country authorises units for international use, it adjusts its emissions balance so the same reduction is not counted twice, once by the country and once by the airline. Depending on the programme, the programme must verify that the corresponding adjustment has been applied, as reflected in the host country’s biennial transparency report, or the units must be covered by a guarantee approved by the programme.
Where can I buy CORSIA First Phase eligible emissions units?
From suppliers that can deliver units issued and labelled by an ICAO-approved programme. ClimateTrade supplies First Phase eligible units on request: we have projects with a Letter of Authorization (LoA) and a corresponding adjustment (CA), among others. Request a quote and we will reply with the options and the documentation for each one.
Can ClimateTrade source a specific programme, project type or carbon removals for CORSIA?
Yes. Tell us the programme, methodology, project type, host country or vintage you need, including removal units from approved programmes. For each option we share the programme, vintage, registry label, Letter of Authorization status and corresponding adjustment status, so your compliance team can check it against the ICAO document. Request a quote to start.
Ask us for your CORSIA First Phase units
Tell us your offsetting requirement and timing. We will reply with First Phase eligible options, including projects with LoA and CA, and full documentation for each one.
Request a quote